Site Surveys

Safe Contactor Approved

UPS’s are permanently connected to the mains and powers essential load equipment 24 hours per day, 365 days per year for its entire lifetime. Unnecessary losses incurred by an incorrectly sized or aged UPS can cost the user thousands of pounds in wasted electricity.

A site survey of the current UPS loading along with associated electrical infrastructure will highlight where users could make improvements to the general operation of their system.

A site survey or efficiency audit can be completed onsite by an engineer without interruption or risk to the critical load. A detailed report is then issued to the user for consideration or further discussion.